The Technical Interface

Building safety advice for complex decisions.

We help clients move complex building safety matters forward: testing the evidence, shaping the strategy, coordinating the process and supporting clear, proportionate decisions.

Discuss an instruction Explore our services

Property Management Awards 2026 finalist

Selected organisations we support

The Crown Estate Tideway Knight Frank Promise Hammerson Penningtons Manches Cooper Addleshaw Goddard Aviva plc S2 Partnership

Where we are usually called in

When the project needs a clear technical lead

Beers is usually instructed when a building safety matter has moved beyond a single report. The evidence, stakeholders, commercial pressure and regulatory route need to be brought into one clear position.

  • The evidence does not join up

    FRAEW, fire strategy, structural evidence, cost plan and management records each say something different. The client needs one evidenced position and someone to reach it.

  • The scope is moving ahead of the evidence

    Remediation cost, programme or specification is being fixed before the assumptions behind it have been tested.

  • A submission has volume but no narrative

    The BAC, Gateway, funding or regulatory pack contains material, but not a clear case a reviewer can follow.

  • The technical issue has become commercial

    Cost, liability, funding, leaseholder communication or legal strategy now depends on what the technical evidence actually supports.

  • A fire safety decision affects the building fabric

    A proposed measure may affect structure, access, moisture, ventilation, maintenance or long-term performance.

  • Nobody is holding the interface

    Consultants, contractors, funders, lawyers, managing agents and residents all have separate questions. The client needs one technical adviser holding the thread and driving the process.

What we do differently

The value is in the interface

Beers works across fire safety, building fabric, structure, remediation, regulation, funding, legal context and stakeholder communication. We review the evidence as one set, challenge assumptions and help clients reach positions that are clear, proportionate and defensible.

  • Evidence before opinionWhat was relied on, its status and its date, recorded before a conclusion is drawn.
  • Building fabric judgementA fire safety measure read against the building as constructed, not in isolation.
  • Technical clarity for decision-makersThe finding, what it means, what it does not mean, and whose decision it is.
Two modern apartment buildings seen from street level against a clear sky, one in brick and one in glass and metal fins.
  • c.1,000buildings under fire and building safety governance
  • £400m+combined project value across active assessment and remediation
  • 75+FRAEW peer reviews
  • 10Building Assessment Certificates secured

What clients say

In their words

  • “Nick remains genuinely independent, even when this means delivering tough messages to clients. There really are few, if any, experts who understand the legal and regulatory position as well as Nick does.”

    Penningtons Manches Cooper LLPPartner

  • “A rare ability to assess these issues holistically, challenge assumptions where necessary, and provide proportionate, evidence-based recommendations. His advice is balanced, practical and independent.”

    ColliersHead of Residential and Living Group

Our approach

Independent. Proportionate. Defensible.

How the work is controlled: evidence first, assumptions stated, limitations clear, and recommendations matched to the risk and the decision in front of the client.

Read our approach

Need a clear position from complex building safety evidence?

Send us the reports, the issue and the decision you need to make. We will tell you whether the evidence supports the position, what remains uncertain and what a proportionate next step looks like.

Discuss an instruction